30 June 2003: Kitchen
Oak trim around window and porcelain, backsplash goes up |
 |
29 June 2003: Master Bath
Wrought iron sconces and pendant are installed in the master bath |
 |
28 June 2003: White Room
Another bedroom is done in a light stain, pickeled white, walnut floor is installed, and faux sky light is installed |
 |
27 June 2003: Master Bath
Sink top goes in and tile around tub |
 |
26 June 2003: Cinnamon Room
One bedroom is done in one of the darker stains, light is installed and so is the hickory floor! (couldn't get the floor AND the light in the same photo...) |
 |
25 June 2003: Loft
Lots of lighting goes up, iron in the great room and loft, lots of different lights in the other rooms, as well as more stainless steel appliances in the kitchen |
 |
24 June 2003: Loft
Vents are installed (black with the help of Rustoleum) and we have air conditioning! |
 |
23 June 2003: Kitchen
Appliances are delivered, stainless steel (blue protective film is still on); and island is moved slightly |
 |
19 June 2003: Master Bath
Maple cabinets go in, grout is done on most of tile (waiting for a dry spell AGAIN so the driveway can go in) |
 |
18 June 2003: Kitchen
Porcelain tile is cut and installed |
 |
17 June 2003: Master Suite
Lighting goes up, hardwood floors are waiting to be installed |
 |
16 June 2003: Kitchen
Base for porcelain counter tops go down, electrician starts to put up lights |
 |
13 June 2003: Kitchen
Oak kitchen cabinets go up in only a couple hours |
 |
12 June 2003: View from Front
Exterior stain goes up, between thunderstorms! |
 |
7 June 2003: Master
Bath
Tile work near completion in bathrooms
|
|